AP SensingProducts / AP Sensing / DAS N51/N52-Series

AP Sensing / Fiber optic sensing & monitoring
DAS N51/N52-Series
Fifth-generation distributed acoustic sensing family for quantitative monitoring of critical infrastructure. The family uses 2P Squared technology and deep-learning event detection, with API integration and two simultaneous sensing channels. Published family-level limits do not establish the configuration of every N5125B, N5225B or N5226B variant.
| Manufacturer | AP Sensing |
|---|---|
| Model / family | DAS N51/N52-Series |
| System | Fiber optic sensing & monitoring |
| Selection & quotation | Based on project specification, configuration and quantities. |
Technical specifications
| Sensing distance | Up to 100 km; family-level ratingSource ↗ |
|---|---|
| Channels | Two simultaneous channels; family-level ratingSource ↗ |
| Sensing technology | 2P SquaredSource ↗ |
| Event detection | Proprietary deep-learning algorithmsSource ↗ |
| Integration | Third-party software, cloud solutions and project-specific APIsSource ↗ |
Ratings, approvals and compatibility apply only to the models and configurations identified in the manufacturer’s documents.
AL KWARIZMI PROJECT SUPPORTSelection · BOQ review · Technical submittals · Delivery
Technical documents
DAS N51/N52-Series · Manufacturer product flyer↓Application brochure · Pipeline Monitoring · Arabic · 2023 edition · Portfolio overview↓Application brochure · Railway Monitoring · Portfolio overview↓Application brochure · Well & Reservoir Monitoring · Portfolio overview↓Application brochure · Geophysical Monitoring · Portfolio overview↓Application brochure · Overhead Line Monitoring · Portfolio overview↓Application brochure · Data Center Monitoring · Portfolio overview↓Application brochure · Mining Infrastructure Monitoring · Portfolio overview↓Application brochure · Power Grid Monitoring · Portfolio overview↓Application brochure · Pipeline Monitoring · Portfolio overview↓LET’S BUILD THE RIGHT PACKAGE
From your BOQ.
To a coordinated solution.
Share your scope, drawings and project requirements.


