KCC’s delivery method connects scope definition, engineering, supply and installation, testing, and handover. The coordination record links what a system receives, what it must do and who is responsible for the interface.
Prepare an agreed cause-and-effect matrix and interface schedule alongside drawings and technical submittals. Carry those references into functional testing and handover records. The project team defines the actual sequence and acceptance requirements.
Prepare for your review
- System boundaries and responsibilities
- Inputs, outputs and agreed functions
- Drawings and cause-and-effect references
- Test records and handover documents